01Survey and quantities
We visit, measure and survey the site, agree the specification, and issue a bill of quantities with every line priced.
Our design team
Every job runs on the same programme. Dates are set when you sign, and if one slips, we tell you the day it slips.
We visit, measure and survey the site, agree the specification, and issue a bill of quantities with every line priced.
Our design team
Every joint, reveal and hinge drawn at 1:5. You sign the drawing set, not a mood board, before anything is cut.
Our design team
Stone slabs tagged and reserved at the yard, veneer numbered and set aside, so what you approved is what arrives.
Our design team
Partner workshops make the joinery to our drawings while the site team runs MEP, partitions and ceilings. The two run side by side.
Partner workshops and our site team
Joinery installed as it was dry-fitted, stone set, then paint, plaster and finishes.
Our site team
Site cleaned, snag list closed, walk-through signed in person.
You and us
A full set of operation and maintenance manuals at handover, then a fit-out warranty and maintenance. We stay on call after we leave site.
On call
Bigger jobs take longer and small ones less. Your own programme is drawn up from the survey and dated when you sign.
About fourteen weeks for a typical job, in six phases from survey to handover. Bigger jobs take longer and small ones less. Your own programme is drawn up from the survey and dated when you sign.
The shop drawings: every joint, reveal and hinge at 1:5. Nothing is cut until you have signed them.
We tell you the day it slips, and what we are doing about it.
Partner workshops, to our shop drawings. Each piece is dry-fitted before it reaches site.
One project manager, from the survey to the handover walk-through. You have one number to call.
A quality inspection and a full set of operation and maintenance manuals, then a fit-out warranty and maintenance. We stay on call after we leave site.